s
Grace Episcopal Church
Grace Episcopal Church

Grace Episcopal Church

Assisted the contractor with design calculations for a new timber frame spire to replace the existing crumbling masonry spire originally constructed in 1880.

Location:New Bedford, MACategory:New Addition
Willow Creek
Willow Creek

Willow Creek

Served as the Engineer of Record for a new low-rise housing development comprised of a variety of rental and owned multi-family buildings. The buildings are designed with lumber platform frames and pre-fabricated truss roofs.

Location:Hartford, CTCategory:New Construction
The minute we begin to think we have all of the answers, we forget the questions.”Madeleine L’Engle
Brook Hill Village
Brook Hill Village

Brook Hill Village

As a phase of a sizable development, The Brook Hill Village project included the design and construction of multiple 12-unit multi-family residential buildings. The buildings are designed with lumber platform frames and pre-fabricated truss roofs.

Location:Suffield, CTCategory:New Construction
Montgomery Mill
Montgomery Mill

Montgomery Mill

Completed the design and construction administration for this National Register listed former tinstel factory on the Connecticut River. Responsible for the structural design of the 1920 reinforced concrete portion of the building, including concrete repairs and work incidental to the adaptive re-use.

Location:Windsor Locks, CTCategory:Adaptive Reuse and Renovation
Saxton B. Little Library
Saxton B. Little Library

Saxton B. Little Library

Served as the structural engineer of record for a much needed renovation, repair and single-story addition to the historic farmhouse bequeathed to the institution and its 1985 expansion.

Location:Columbia, CTCategory:New Addition
Sheffield Island Sea Wall
Sheffield Island Sea Wall

Sheffield Island Sea Wall

Designed new timber piling and ballasted sea wall to help protect the Sheffield Island Lighthouse constructed in 1868.

Location:Norwalk, CTCategory:New Construction
Swift Factory
Swift Factory

Swift Factory

Completed the design and construction administration for the adaptive re-use of this National Register listed gold leaf factory complex into small business production and office spaces. The buildings range in age from 1887 to 1948.

Location:Hartford, CTCategory:Adaptive Reuse and Renovation
A team is not a group of people who work together. A team is a group of people who trust each other.”Simon Sinek
Trinity College, Ferris Athletic Center - Systems Upgrades
Trinity College, Ferris Athletic Center - Systems Upgrades

Trinity College, Ferris Athletic Center - Systems Upgrades

Designed new structure for various roof top units, assessed roof for future modifications, and designed repairs to water-damaged wall in this collegiate athletic complex.

Location:Hartford, CTCategory:Renovation
Trinity College, Life Science Center - Boyer Auditorium Renovation
Trinity College, Life Science Center - Boyer Auditorium Renovation

Trinity College, Life Science Center - Boyer Auditorium Renovation

Designed new mezzanine level to make existing steeply sloped auditorium space into one with a shallower slope. Fast-tracked summer project.

Location:Hartford, CTCategory:Renovation
Wadsworth Atheneum - Basement / Art Storage Renovation
Wadsworth Atheneum - Basement / Art Storage Renovation

Wadsworth Atheneum - Basement / Art Storage Renovation

Provided the structural design associated with reconfiguring existing basement spaces into an integrated state of the art collection storage space.

Location:Hartford, CTCategory:Renovation
If you focus on providing genuine value, you will succeed.”John Bates
Residence on Martha's Vineyard
Residence on Martha's Vineyard

Residence on Martha's Vineyard

Designed a new addition including new deck space for this island home.

Location:Edgartown, MACategory:New Addition
Willington Town Hall
Willington Town Hall

Willington Town Hall

Performed a conditions assessment and designed repairs for renovation of the structure into community space. Constructed in 1876, this timber-framed building originally served as the Willington Congregational Church and later as the Town Hall from 1926 to circa 1980.

Location:Willington, CTCategory:Design of Repairs